Customize Consent Preferences

We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.

The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ... 

Always Active

Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.

No cookies to display.

Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.

No cookies to display.

Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.

No cookies to display.

Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.

No cookies to display.

Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.

No cookies to display.

Madziwa Gold: Gold Belt Project

Main Content

Mineral
Gold
Ownership
100%
Location
Mashonaland Central
Size
27,733 Acres (112 km2)

Currently, it is estimated that, of the gold being produced, 50% is used in jewelry, 40% in investments, and 10% in industry. Zimbabwe has been a gold producer for over two hundred years. According to the World Gold Council, in 2020, Zimbabwe produced 107 tons of gold and was the 7th largest gold producer country. Mashonaland Central was one of the largest gold-producing province in the country, accounting for around 34% of the gold output that year, according to Statista, a market intelligence firm.

Our subsidiary Madziwa Gold owns 132,173 acres of mineral rights for gold distributed in seven projects, six of which are in early stage while one of them, the Gold Belt Project, has been preliminarily researched and is being developed towards a gold mine. The Gold Belt Project is located in the province of Mashonaland Central at the north-west edge of the Ripple Creek mining district, the number one gold-producing region in Zimbabwe.

Madziwa Gold’s 100%-owned Gold Belt Project encompasses 27,733 acres distributed in twelve mineral rights for gold. Approximately 2% of this total area has been studied over fifteen years ago by a prior owner, by drilling superficial terrain layers of saprolite and colluvium and identifying gold in multiple targets. The technical report produced at that time under the local mining department standard estimated gold mineralization of 64,000 ounces in the researched area with an average gold density of 1.54 g/t; the cutoff used in such report was 0.8 g/t.

In 2020, detailed trenching under the supervision of gold geologists was carried out in approximately 2% of the mineral right area encompassing the Gold Belt Project. In 2021, Oxford Geoconsultants, a technical consulting firm with a gold expert that meet the “Qualified Person” criteria under Regulation S-K 1300, released its independent technical report on the project under the NI 43-101 industry format. This report presents Oxford’s estimate of 75,018 ounces of gold in indicated and inferred resources for the 2% of the Gold Belt Project area which was studied.

Madziwa Gold’s technical team has performed additional work in existing shafts located within the 2% of the property that had been previously researched. In 2021, a revised NI 43-101 technical report indicated gold mineralization of 84,000 ounces with a cutoff at 0.8 g/t. RCS, an independent advisory firm, has indicated that the gold deposits at the Gold belt Project are of greenstone belt type. Further work is ongoing at the Gold Belt Project to expand the knowledge of and the measured size of the deposit.